Model: Klaro CLASSIC
Size: 1000 (users)
Location: Platte Island
–
We were able to develop the treatment technology for a newly built 5-star hotel, because there is no normal sewage system here. It was important to our customer that the plant could be put into operation well before the opening, as it was to treat the wastewater of the workers during the construction work. They also wanted to use the treated wastewater to water the green areas.

Solution with KLARO wastewater treatment plants:
Two-line KLARO treatment technology
Designed for 1,000 PE, 150 m³ per day
The two-line mechanical engineering was set up in a specially constructed machine room
Additional chlorination and phosphate precipitation for subsequent reuse